Steps in Asbestos Removal Procedures

For you to have a clear view on removingwater mixed with liquid detergent. Don't ever blow
asbestos here are some guidelines you need toup the contaminated area with water. This is
remember.crucial to maintain the fibers undamaged so to
1. Preparationforbid them from being breathed in. You may
Part of the preparation for the removal ofbegin scraping off the asbestos bearing material
asbestos containing materials is by complying withcautiously when your finished soaking it. Never
the Asbestos Removal Code. Specifying the limitsbreak them into pieces for they may still contain
required in the removal procedure is veryfibers which you could ingest. You need to
important. You need to keep the place secure bycarefully scrape all of the material and leave it
putting up signs and barriers in the area so thatintact. The material should still be soaked in water
no one can enter the premise. After which,when this process is done. Otherwise, it is time
electrical, lighting installations and furniture must befor you to stop working and call in an expert to
removed. The ventilation and air conditioning mustfinish the job. You need to scrape off the walls or
be sealed off to prevent asbestos from enteringflooring first before sealing the area with paint.
the ventilation ducts. In case you need to have3. Disposal of Asbestos Containing Materials
lighting in the area, you should use portable workAfter scraping off the material, you need to place
lights which are wired and grounded to an outsideit in special disposal bags including your disposable
circuit for safety measures. Personal Protectivecoveralls. These should be double bagged and
Equipment (PPE) should as well be accessible. Totaldouble wrapped. Specific bin is compulsory in
protective wear, head covers, masking,overputting away asbestos because it is unlawful to
boots, gloves and respiratory protective gearplace asbestos waste and combine it with
such as a gas mask with dual cartridges anddomestic garbage bins. Appropriate classification
HEPA filters are needed. To prevent asbestosand the contents of the waste material is needed
from being airborne, tools needed for the removalfor each bag for security purposes. Asbestos
may include a 2-3 gallon tank sprayer, liquidwaste must be disposed in designated landfills
detergent, putty knives, step ladders, plasticassigned by your local council so it is important to
sheeting, asbestos waste disposal bags, duct tape,set an appointment with them on when you can
sealant. To contain the work area, plastic sheetinghave your asbestos containing material disposed.
must be used on the walls and floors and sealIf you need to hire a company to dispose of your
everything off with a duct tape.asbestos waste, never forget to keep a copy of
2. Asbestos Removal Procedurethe receipts as the council may seek these
After preparing the work site and the materialsdocuments to ensure the proper disposal of the
needed, you need to carefully wet the asbestosasbestos waste.
containing material with "amended" water, which is