Operations ( HEALTH, SAFETY ENVIRONMENT)

OSHE Operations:- § Significant public interest, media involvement
OSHE Trainingor regulatory intervention
Training is a fundamental and necessary method- § Significant impact on business reputation
for shaping behaviors and developing our- § Loss, damage or interruption to business
employees.  An effective training program can> $5M
inform employees of the OSHE hazards andAlmost Certain
controls in the workplace, help them recognize- Likely to occur frequently in the period of
and appropriately respond to hazardous situationscontract
and drive compliance to OSHE rules and- Likely to occur several times per year
procedures established by the organization/site.  
Therefore, based on the work being performed 
and the results of the Risk Assessment, a training 
needs assessment will be developed for theMajor
project.- Extensive injury or Hospitalization of employees,
 contractors, or the public.
The assessment will identify:- Financial loss > 50% but < 80% of contract
- Training programs required for each job or jobvalue
classification- Moderate public interest, media involvement or
- Training and testing frequencyregulatory intervention
- Training programs shall be appropriate for the- Moderate impact on business reputation
intended audience and adequately address- Loss, damage or interruption to business >
organizational levels, risks, ability, literacy and$1M but < $5M
language skills.Highly Likely
- Where necessary to achieve the desired- Likely to occur several times in the period of
performance, training programs shall be specific tocontract
the workplace, activities or operations- Might occur once in 5 years
- Where required by legal and other requirements 
or by Project/ Operations Execution OrganizationSerious
OSHE Standards, the organization shall identify- Medical treatment of employees, contractors, or
expected competency level and implementthe public.
methods to assess competency as a result of- Financial loss > 20% but < 50% of contract
the training.value
- Training programs shall be reviewed and updated- Some public interest, media involvement or
to reflect changes to the workplace, activities,regulatory intervention
equipment, processes, or procedures.- Some impact on business reputation
Communications- Loss, damage or interruption to business >
An effective and formal process to ensure the$100K but < $1M
proper flow and exchange of information is a keyLikely
element to any well-managed project. - Likely to occur in the period of contract
Communication is critical to OSHE Management- Might occur once in 5 years
System execution due to the importance of 
knowing expectations, performance, and the riskMinor
associated with the project.  The Project Team's- First-aid treatment of an employee, contractor,
ability to effectively communicate and involve theor a Unlikely
workforce will help ensure a successful OSHE- Possible, but unlikely in the period of contract
culture.- Might occur once in 10 years
 - member of the public
Both internal and external communication channels- Financial loss > 5% but < 20% of contract
must be effectively established. Internal two-wayvalue
communication is critical to success.  Employees- Loss, damage or interruption to business >
must feel comfortable to report any and all OSHE$5K but < $100K
issues plus have the knowledge of the processesUnlikely
established for doing so.- Possible, but unlikely in the period of contract
 - Might occur once in 10 years
In addition, a sound and consistent process to 
engage key external stakeholders (customer,Negligible
contractors) will ensure the accuracy and- § Other than above
effectiveness of external communication.  The 
Project Manager will establish the process forRemote
communicating with the customer and other- Highly unlikely in the period of contract
stakeholders.- Might occur once in 100 years
Document and Records Management 
Project/ Operations Execution Organization utilizesTool Box Talk Record
OSHE documents such as procedures, workProject : Location :
instructions, checklists and training tools to ensureDate : Person Giving Toolbox Talk :
those affected by the OSHE ManagementTask Description
System are aware of their roles andHazards Identified:
responsibilities, past OSHE performance,Fall from height
maintenance of a safe work environment and 
compliance with Project Execution Organization,Repetitive Motion
customer and regulatory policy/ standards. 
OSHE records are to be maintained at the projectRotating Equipments
per Project Execution Organization's OSHE 
Management System requirements.Falling Objects
Operation Controls/ Standard Work Procedures 
An important step in successfully managing OSHEManual handling
risks is the active process of gaining operational 
control over significant OSHE aspects recognizedStruck by/Crushing Hazards
by the Risk Assessment process.  Operational 
control can be achieved by a variety of effectiveMoving machinery/Vehicle
methods such as engineering controls, standard 
work instructions, training, and preventativeFire Hazards
maintenance programs. 
The first priority should be to ask if the workUncontrolled release of energy
task is necessary.  If it is determined that the 
task is necessary, then per the operationalOver head cranes and hoists
controls hierarchy, we are to provide engineering 
solutions regarding OSHE risks.Radiation Hazards
Where engineering solutions do not eliminate the 
risk, work instructions and training must beInsufficient Lighting
developed. Documented work instructions ensure 
that the necessary steps and activities forAdverse weather
controlling risks are completed correctly, at the 
right time, by the right people, and the same wayChemicals
every time. 
Personal Protective Equipment (PPE) is the lastHigh Noise Levels
control form we endeavor to take.  In some 
work environments, PPE will be requiredContact with electricity
regardless of other controls as added protection. 
The site is to provide the required PPE and willDrowning
need to establish site specific distribution controls 
of the PPE.   Project/ Operations ExecutionBacteria, Fungi, Virus etc
Organization must have preferred vendors and 
processes are in place for acquiring PPE.Pest , Reptiles, animals
OSHE Corrective Actions 
A nonconformance is any deviation from theCompressed gas
OSHE Management System.  This includes 
deviation from Project/ Operations ExecutionDust other respiratory hazards
Organization or stakeholder policy or standards, 
established OSHE procedures, rules, regulationsViolence
and voluntary commitments.  A nonconformance 
is often an indication of weakness or a flaw thatFlammable Liquids
requires corrective and/or preventive actions to 
improve the effectiveness of the managementConfined spaces
system.  Once a nonconformance is identified it is 
critical that systems are available and activatedVibration Hazards
that ensure the most effective and feasible 
corrective actions are selected, responsibility isSlip, Trip and Fall
assigned, reasonable timeframe are defined and 
completion of the corrective actions areInadequate skill
confirmed. 
Auditing, Inspections and Self AssessmentsTask not clear
A vital element of our OSHE Management 
System is a systematic and structuredObstructed access and egress
verification of system performance and regular 
feedback that allows the project to manage andProtruding Objects
continually improve performance. 
An effective OSHE auditing and self- assessment 
program is one that objectively obtains and 
evaluates performance in order to: (1) determine 
if the management system is effectively 
implemented and delivering expected 
performance, (2) assess whether the organization 
complies with the policy and standards established 
by Project/ Operations Execution Organization and 
applicable regulatory agencies, and (3) 
communicate valuable information so Project/ 
Operations Execution Organization leadership is 
able to proactively manage OSHE risks and 
performance.Personnel Attending
 Name
The project will have an established method ofPosition
conducting site inspections, task performanceEmployee ID
observations, OSHE audits and self assessmentsSignature
to a pre-determined schedule (daily, weekly, etc.) 
which is posted and communicated to all parties. 
Records are to be maintained on site and be 
available for review at any time. 
OSHE Metrics and Management Reviews 
Regular reviews of our OSHE Management 
System enhance our ability to achieve the desired 
performance from our system.  The intent of 
the review is for the project's leadership to 
evaluate, manage and continually improve the 
performance of its management system. 
  
Since the most effective management system is 
one that is fully integrated into the way we 
conduct business, the most effective and 
desirable OSHE management system review is 
one that is integrated into the normal business or 
operations review process. Project Management 
Team (PMT) members should directly interface 
with the client's project team by participating in 
any established weekly, monthly or formal 
presentations.  Review of OSHE metrics as 
defined by the project's OSHE plan are to be 
presented and recommendations for 
improvement assigned to a Project/ Operations 
Execution Organization or client's team member. 
All related OSHE Incidents/Events must be 
reported via internal reporting process and  to be 
tracked using the Corporate OSHE Event Tracking 
System on Project Execution Organization's 
Intranet. Metrics shall be communicated and 
reviewed by the project management team on aConsultation Feedback
regular basis. Corrective and preventive actions, 
target dates and ownership are to be assigned to 
each event and tracked accordingly.Contract Classification from safety Point of view
OHSE Risk assessment worksheet TEMPLATE 
 Scope of Work:
ContractDate Classified:
  
Project IDProject number:
  
Project NameProject Description:
  
 Project Manager:
Client & Customer 
  
  
Project ManagerContract Cost Exposure
 Value
Contact address (Cell phone)1
 What is the forecast contract cost /annum
Email address(000's)
 <100K
Scope of Site WorkContract Duration
  
 2
Sub-ContractorWhat is the total expected duration of the
 contract? (In months)
Sub-Contractor's representative48 – 60 months
 3
Contact address (Cell phone)What is the anticipated duration of site works? (In
 months)
Email address12 – 24 months
 Contract complexity
Sub-Contractor's Scope of Site Work 
 4
 What percentage of project team have good
Date of Assessmentexperience with products and materials to be
 used?
 70%
Assessment Team members5
 What percentage of total labour depends on
 Contract or subcontract labour?
 80%
 6
 What is the total forecast labour content of the
 contract? (Exposure hours)
 40%
 7
 What percentage of the project team have good
 experience in this market?
Likelihood10%
ConsequenceContract Risks
Negligible 
Minor8
SeriousHow many risk elements exist in the contract
Majorscope of work?
Catastrophic1 or more of the listed activities
Almost Certain 
ModerateContract should be treated as( major/ medium
Majorminor)
Major 
MajorMajor
Major 
Highly Likely 
Moderate 
Moderate 
ModerateOnce contract has been classified. Print this sheet
Majorand file in project or service contract file.
Major 
Likely 
Minor 
Minor 
Moderate 
ModerateRisk Profile
MajorHSE Requirements
UnlikelyMinor Risk Contract
Minor1. Hazard & Risk assessment required
Minor 
Minor2. Implement controls
Moderate 
Major3. Manage subcontractors in accordance with their
Remoterisk profile
Minor 
MinorMajor Risk Contract
Minor1. Hazard & Risk assessment required
Moderate 
Moderate2. Implement controls
Consequence Criteria 
Likelihood Criteria3. Manage subcontractors in accordance with their
Risk Reduction Control Hierarchyrisk profile
Catastrophic 
- § Fatality of employees, contractors, or the4. Site safety plan required
public 
- § Financial loss greater than 80% of contract5. Manage contract progress in accordance with
valuesafety plan.